Most roof replacements in Tyler are done in a single day. A larger or more complex home takes two, and a metal roof or a job with a lot of decking replacement can take three or more. The on-roof part is the shortest part of the whole process. From the first call to the final walkthrough, plan on one to three weeks, depending on insurance and material lead times. Here is how the timeline breaks down.
The full timeline
Inspection and estimate: same day to a few days
Advantage offers free, same-day inspections in the Tyler area. You get photos, a written report and a detailed estimate. If it is a storm claim, the insurance steps come next and add a week or two.
Material selection and ordering: a few days
Once you choose a shingle line and color, we order materials. Common Owens Corning, GAF and CertainTeed lines are stocked locally. After a large regional hail storm, popular colors can run short for a while.
Delivery: the day before
Shingles are usually delivered by boom truck and set on the roof the day before the crew arrives.
The replacement: usually one day
A typical crew arrives early, tears off the old roof, replaces any bad decking, installs underlayment, flashing and shingles, and cleans up by late afternoon. On a large home the crew works in sections so no part of the roof is left open overnight.
Final walkthrough and cleanup: same day
Magnetic sweep of the yard and driveway for nails, haul-away of debris, and a walkthrough with you. The written warranty and, for claims, the completion paperwork for the insurer follow.
What makes a job take longer
- Size: a 40-square roof is roughly twice the work of a 20-square roof.
- Pitch: steep roofs require harnesses and staging and move slower.
- Complexity: many hips, valleys, dormers, skylights and chimneys mean more flashing and cutting.
- Decking: rotten plywood has to be replaced before anything goes on top. We quote a per-sheet price up front so there is no surprise.
- Layers: a roof with two old layers takes longer to tear off.
- Metal: standing seam panels are measured, cut and seamed on site, and take longer than shingles.
- Weather: see below.
What happens if it rains
We watch the forecast and do not start a tear-off into a day with rain on the radar. If a surprise shower moves in, the crew covers the exposed sections with tarps and synthetic underlayment, which is water resistant and designed for exactly that. Rain delays push the job to the next clear day; they do not leave your home exposed. In Tyler the wet months are spring and early summer, and that is also storm season, so a few days of flexibility in the schedule is normal.
How long after a hail storm?
After a widespread storm, every roofer in East Texas is busy and material yards run behind. Homeowners who get their inspection and claim started in the first week or two tend to be on the schedule weeks ahead of those who wait. The claim process itself, from filing to approved scope, commonly takes one to three weeks.
What you need to do during the job
Not much. Move vehicles out of the driveway, take fragile items off walls (hammering vibrates the house), and keep pets and kids inside. You can stay home; most people do. Expect noise from early morning until the crew finishes.
Does Advantage do it in one day?
On most Tyler homes, yes. Our crews are sized to the job, and a standard single-family roof is finished and cleaned up the same day. Larger or steeper homes get an honest two-day estimate up front.